top
FAQ

Nucleon is a overhead crane, gantry crane, coal series hoisting equipment, small light lifting equipment and other products of research and development, manufacture, installation, sales and service as one of the Sino-foreign joint ventures.We provide high quality products and after-sales service!Welcome to consultation!

HOME » FAQ » Overhead crane inspection methods

Overhead crane inspection methods

The inspection methods of Overhead crane

Before used the Overhead crane need to test working state whether can security work, so for the Overhead
crane what inspection should be done
When the Overhead crane finish installed and after the inspection, Electric hoist will do not lifting heavy weights, stop all
running mechanism, to cut off the total power, and wind protection measures, called a non-working state.
1)Designated by the competent department in charge of testing by the state inspection method for
inspection samples, products conform to the state specified standards or technical specifications of all
requirements. By the manufacturer or local state bureau of quality and technical supervision
2)When delivery, the factory technical department together with the users acceptance, inspection before
delivery. Including empty load, static load and dynamic load performance test, all the safety device
testing, continuous operation test
3)When the equipment in the normal service condition, must perform regular inspections. According to the
season and usage, a quarterly. Regular inspection including performance test, the safety device, etc

Overhead crane is one of our main products. We can supply various Overhead Crane for workshop. For more details, please contact us via info@nucleoncranegroup.com

We are manufacturer supplying all kinds Of Gantry crane,Overhead crane,Jib crane,Electric hoist with accessories! Inquiry to Get Latest Quotation and Product Catalogue !