Double Girder Ceiling Overhead Cranes
Double Girder Ceiling Overhead Cranes
1, Overhead traveling on the steel structure, normally in workshop, heavy working duty from A5-A8
2, Light self weight, could save steel structure cost.
3, Lifting and traveling is very accurate.
4, VVF/ frequency inverter control, 3-5 speeds to operate, stable to lift and running.
5, Six direction action, to make sure the enough wide working area.
6, Full safety system as follows: Weight overload protection Emergency stop system Over current protection,Short-circuit protection Phase sequence protection Zero position protection Voltage loss protection Limit switch and stopper for crane long traveling and cross traveling Lifting over-high and over-low limit switch.